  • (DOC) EQUIPMENT OUTPUT/DAY BASIC ASSUMPTIONS

    EQUIPMENT OUTPUT/DAY BASIC ASSUMPTIONS: 1. Average output of Road Roller (12 passes) 360 m3/day (FLAT) (Vibratory Roller) 300 m3/day (ROLLING & MOUNTANOUS) 2. Average output of Road Grader 400-500 m2/day 3. Average output of Asphalt Distributor 2,400 m2/day 4. Average output of Transit Mixer 30 m3/day (8 trips – 4 cu. m. cap) 5.

    Get Price
  • DPWH Cost Estimate Guidelines.pdf - EQUIPMENT

    EQUIPMENT OUTPUT/DAY BASIC ASSUMPTIONS: 1. Average output of Road Roller (12 passes) 360 m 3 /day (FLAT) (Vibratory Roller) 300 m 3 /day (ROLLING & MOUNTANOUS) 2. Average output of Road Grader 400-500 m 2 /day 3. Average output of Asphalt Distributor 2,400 m 2 /day 4. Average output of Transit Mixer 30 m 3 /day (8 trips – 4 cu. m. cap) 5.

    Get Price
  • 8. PERFORMANCE

    2021-2-17u2002·u2002For a 4 m wide road, an amount of 1 m 3 of ballast per metre of forest road would be necessary. The productivity of a motor grader spreading gravel on the road may range from 150 to 250 m per machine hour. For grading 1 km of forest road, around half to one machine operating day …

    Get Price
  • 4. ESTIMATING ROAD CONSTRUCTION UNIT COSTS

    2021-2-17u2002·u2002Five hectares per km of right-of-way in hardwoods are being cleared for a road (extra width is being used to help the road dry after rains). Of the five hectares, 1.2 hectares per km will need to have the stumps removed. Tractor machine rate is $80 per hour. All material will be piled for burning. Work is being done by a 335 HP bulldozer.

    Get Price
  • Labour Requirement & Output Per Day For Different Civil

    2021-10-26u2002·u2002In a project budget, the toughest thing is to identify the source of material and required manpower calculation. We have to deploy adequate manpower to complete a certain activity without any chaos.. In this post, we had listed out the approx labour requirement for civil works and also Labour output per day for different works.. In the earlier post, we had seen the material calculation for ...

    Get Price
  • CalcTool: Data transfer time calculator

    Note that transfer rates are quoted as binary values (i.e. 1 Mbps = 1024 Kbps). Also note the difference between the case of the 'b' - '-bps' means bits per second and '-Bps' means Bytes per second. For data quantity, you may choose between binary (e.g. MiB) or decimal (e.g. MB) versions of units.

    Get Price
  • Day Counter - Calculator

    Free day counter to count the number of days between two dates, including the number of working days, weekends, and holidays. It can also add or subtract days from a chosen date to find the new date. Also explore hundreds of other calculators addressing time, date, finance, math, fitness, health, and more.

    Get Price
  • DPWH Cost Estimate Guidelines.pdf - EQUIPMENT

    EQUIPMENT OUTPUT/DAY BASIC ASSUMPTIONS: 1. Average output of Road Roller (12 passes) 360 m 3 /day (FLAT) (Vibratory Roller) 300 m 3 /day (ROLLING & MOUNTANOUS) 2. Average output of Road Grader 400-500 m 2 /day 3. Average output of Asphalt Distributor 2,400 m 2 /day 4. Average output of Transit Mixer 30 m 3 /day (8 trips – 4 cu. m. cap) 5.

    Get Price
  • How to Calculate Load Carrying Capacity of Conveyor

    2020-4-27u2002·u2002Calculating load on conveyor roller is simple arithmetic and very easy. Assume that you have to design a Gravity Roller Conveyor System for carton box conveying. Weight of the carton box is 50kg Length of the box is 400mm Width of the box is 300mm Lets Calculate width of the rollers = width of the carton box + 50mm So Roller length is 350mm Now we have to decide how many rollers will be below ...

    Get Price
  • Hand arm vibration - Exposure Calculator

    2021-8-9u2002·u2002Hand-arm vibration exposure calculator. As part of the package which supports the Control of Vibration at Work Regulations 2005 we have produced a calculator to assist in calculating exposures for hand-arm vibration. Before using the calculator please read the guidance leaflet below. Hand-arm vibration at work: A brief guide (INDG175) [1] [1 ...

    Get Price
  • Production Rate Calculator

    2016-4-6u2002·u2002This calculator give you that answer. Use the Volume over Time function with the Unit Volume (uV) equal to 70 gallons, the Duration of Production (dU) equal to one day and the Period of Production (P) equal to 12 weeks. At a constant rate, your herd will produce 5,880 gallons of milk in 12 weeks. Working the other direction.

    Get Price
  • Labour Requirement & Output Per Day For Different Civil

    2021-10-26u2002·u2002In a project budget, the toughest thing is to identify the source of material and required manpower calculation. We have to deploy adequate manpower to complete a certain activity without any chaos.. In this post, we had listed out the approx labour requirement for civil works and also Labour output per day for different works.. In the earlier post, we had seen the material calculation for ...

    Get Price
  • MEASURING ROLLER CHAIN LENGTH TECHNICAL SHEET

    2020-7-31u2002·u2002MEASURING ROLLER CHAIN LENGTH INSTRUCTIONS 1. The measurement should contain equal number of roller links and pin links. 2. Measuring longer sections will give more realistic estimations. 3. Chain on equipment should be measured on the tension side. 4. Measurement is outside of pin to outside of pin. 5. Chain not on equipment requires the ...

    Get Price
  • Calculator.net: Free Online Calculators - Math, Fitness ...

    Calculator.net's sole focus is to provide fast, comprehensive, convenient, free online calculators in a plethora of areas. Currently, we have around 200 calculators to help you 'do the math' quickly in areas such as finance, fitness, health, math, and others, and we are still developing more.

    Get Price
  • Department of Public Works and Highways

    2018-7-31u2002·u2002Output per hour: Quantity: DETAILED UNIT PRICE ANALYSIS Construction of By-Pass and Diversion Roads - Vitali - Sibulao - Road of N 1), Package 4, Zamboanga City A.] (3) Construction of Field Office for the Engineer L.S. Bypass Road Project (Alternate I .00 No. E of Persons No. of Ui ment No. No. 7.00 m. x 9.00 T - Cfassoom, for

    Get Price
  • Analysis of Rates of Building Construction in Excel

    2021-7-12u2002·u2002Coarse sand = Rs 800 per cum. Cement 50 kg bag = Rs 270 per bag. Twisted bars = Rs 5000 per Quintel. Bitumen = Rs 10 per kg. See More Units Calculator Excel Sheet for Conversion of Measurement. Mason = Rs 550 per day. Plaster = Rs 300 per day. Carpenter = Rs 500 per day. Bhishti = Rs 350 per day.

    Get Price
  • Rate Analysis of Excavation in Earthwork

    2021-10-27u2002·u2002•Rate analysis of excavation in earthwork use of IS Code 1200 part 1, Part 27, IS 4988, IS 12138 (Part IV) and CPWD for calculation is this measurement of the quantity of excavation to be carried out, the cost of labour, machinery, and other equipment like hard soil for breaker, etc.

    Get Price
  • DPWH Cost Estimate Guidelines.pdf - EQUIPMENT

    EQUIPMENT OUTPUT/DAY BASIC ASSUMPTIONS: 1. Average output of Road Roller (12 passes) 360 m 3 /day (FLAT) (Vibratory Roller) 300 m 3 /day (ROLLING & MOUNTANOUS) 2. Average output of Road Grader 400-500 m 2 /day 3. Average output of Asphalt Distributor 2,400 m 2 /day 4. Average output of Transit Mixer 30 m 3 /day (8 trips – 4 cu. m. cap) 5.

    Get Price
  • How to Calculate Load Carrying Capacity of Conveyor Rollers?

    2020-4-27u2002·u2002Calculating load on conveyor roller is simple arithmetic and very easy. Assume that you have to design a Gravity Roller Conveyor System for carton box conveying. Weight of the carton box is 50kg Length of the box is 400mm Width of the box is 300mm Lets Calculate width of the rollers = width of the carton box + 50mm So Roller length is 350mm Now we have to decide how many rollers …

    Get Price
  • Hand arm vibration - Exposure Calculator

    2021-8-9u2002·u2002Hand-arm vibration exposure calculator. As part of the package which supports the Control of Vibration at Work Regulations 2005 we have produced a calculator to assist in calculating exposures for hand-arm vibration. Before using the calculator please read the guidance leaflet below. Hand-arm vibration at work: A brief guide (INDG175) [1] [1 ...

    Get Price
  • Production Rate Calculator

    2016-4-6u2002·u2002This calculator give you that answer. Use the Volume over Time function with the Unit Volume (uV) equal to 70 gallons, the Duration of Production (dU) equal to one day and the Period of Production (P) equal to 12 weeks. At a constant rate, your herd will produce 5,880 gallons of milk in 12 weeks. Working the other direction.

    Get Price
  • Labour Requirement & Output Per Day For Different Civil Works

    2021-10-26u2002·u2002In a project budget, the toughest thing is to identify the source of material and required manpower calculation. We have to deploy adequate manpower to complete a certain activity without any chaos.. In this post, we had listed out the approx labour requirement for civil works and also Labour output per day for different works.. In the earlier post, we had seen the …

    Get Price
  • MEASURING ROLLER CHAIN LENGTH TECHNICAL SHEET

    2020-7-31u2002·u2002MEASURING ROLLER CHAIN LENGTH INSTRUCTIONS 1. The measurement should contain equal number of roller links and pin links. 2. Measuring longer sections will give more realistic estimations. 3. Chain on equipment should be measured on the tension side. 4. Measurement is outside of pin to outside of pin. 5. Chain not on equipment requires the ...

    Get Price
  • Calculator.net: Free Online Calculators - Math, Fitness ...

    Calculator.net's sole focus is to provide fast, comprehensive, convenient, free online calculators in a plethora of areas. Currently, we have around 200 calculators to help you 'do the math' quickly in areas such as finance, fitness, health, math, and others, and we are still developing more.

    Get Price
  • Department of Public Works and Highways

    2018-7-31u2002·u2002Output per hour: Quantity: DETAILED UNIT PRICE ANALYSIS Construction of By-Pass and Diversion Roads - Vitali - Sibulao - Road of N 1), Package 4, Zamboanga City A.] (3) Construction of Field Office for the Engineer L.S. Bypass Road Project (Alternate I .00 No. E of Persons No. of Ui ment No. No. 7.00 m. x 9.00 T - Cfassoom, for

    Get Price
  • Analysis of Rates of Building Construction in Excel

    2021-7-12u2002·u2002Coarse sand = Rs 800 per cum. Cement 50 kg bag = Rs 270 per bag. Twisted bars = Rs 5000 per Quintel. Bitumen = Rs 10 per kg. See More Units Calculator Excel Sheet for Conversion of Measurement. Mason = Rs 550 per day. Plaster = Rs 300 per day. Carpenter = Rs 500 per day. Bhishti = Rs 350 per day.

    Get Price
  • Rate Analysis of Excavation in Earthwork

    2021-10-27u2002·u2002•Rate analysis of excavation in earthwork use of IS Code 1200 part 1, Part 27, IS 4988, IS 12138 (Part IV) and CPWD for calculation is this measurement of the quantity of excavation to be carried out, the cost of labour, machinery, and other equipment like hard soil for breaker, etc.

    Get Price
  • DPWH Cost Estimate Guidelines.pdf - EQUIPMENT

    EQUIPMENT OUTPUT/DAY BASIC ASSUMPTIONS: 1. Average output of Road Roller (12 passes) 360 m 3 /day (FLAT) (Vibratory Roller) 300 m 3 /day (ROLLING & MOUNTANOUS) 2. Average output of Road Grader 400-500 m 2 /day 3. Average output of Asphalt Distributor 2,400 m 2 /day 4. Average output of Transit Mixer 30 m 3 /day (8 trips – 4 cu. m. cap) 5.

    Get Price
  • How to Calculate Load Carrying Capacity of Conveyor

    2020-4-27u2002·u2002Calculating load on conveyor roller is simple arithmetic and very easy. Assume that you have to design a Gravity Roller Conveyor System for carton box conveying. Weight of the carton box is 50kg Length of the box is 400mm Width of the box is 300mm Lets Calculate width of the rollers = width of the carton box + 50mm So Roller length is 350mm Now we have to decide how many rollers will be below ...

    Get Price
  • Hand arm vibration - Exposure Calculator

    2021-8-9u2002·u2002Hand-arm vibration exposure calculator. As part of the package which supports the Control of Vibration at Work Regulations 2005 we have produced a calculator to assist in calculating exposures for hand-arm vibration. Before using the calculator please read the guidance leaflet below. Hand-arm vibration at work: A brief guide (INDG175) [1] [1 ...

    Get Price
  • Production Rate Calculator

    2016-4-6u2002·u2002This calculator give you that answer. Use the Volume over Time function with the Unit Volume (uV) equal to 70 gallons, the Duration of Production (dU) equal to one day and the Period of Production (P) equal to 12 weeks. At a constant rate, your herd will produce 5,880 gallons of milk in 12 weeks. Working the other direction.

    Get Price
  • Labour Requirement & Output Per Day For Different Civil

    2021-10-26u2002·u2002In a project budget, the toughest thing is to identify the source of material and required manpower calculation. We have to deploy adequate manpower to complete a certain activity without any chaos.. In this post, we had listed out the approx labour requirement for civil works and also Labour output per day for different works.. In the earlier post, we had seen the material calculation for ...

    Get Price
  • MEASURING ROLLER CHAIN LENGTH TECHNICAL SHEET

    2020-7-31u2002·u2002MEASURING ROLLER CHAIN LENGTH INSTRUCTIONS 1. The measurement should contain equal number of roller links and pin links. 2. Measuring longer sections will give more realistic estimations. 3. Chain on equipment should be measured on the tension side. 4. Measurement is outside of pin to outside of pin. 5. Chain not on equipment requires the ...

    Get Price
  • Calculator.net: Free Online Calculators - Math, Fitness ...

    Calculator.net's sole focus is to provide fast, comprehensive, convenient, free online calculators in a plethora of areas. Currently, we have around 200 calculators to help you 'do the math' quickly in areas such as finance, fitness, health, math, and others, and we are still developing more.

    Get Price
  • Department of Public Works and Highways

    2018-7-31u2002·u2002Output per hour: Quantity: DETAILED UNIT PRICE ANALYSIS Construction of By-Pass and Diversion Roads - Vitali - Sibulao - Road of N 1), Package 4, Zamboanga City A.] (3) Construction of Field Office for the Engineer L.S. Bypass Road Project (Alternate I .00 No. E of Persons No. of Ui ment No. No. 7.00 m. x 9.00 T - Cfassoom, for

    Get Price
  • Analysis of Rates of Building Construction in Excel

    2021-7-12u2002·u2002Coarse sand = Rs 800 per cum. Cement 50 kg bag = Rs 270 per bag. Twisted bars = Rs 5000 per Quintel. Bitumen = Rs 10 per kg. See More Units Calculator Excel Sheet for Conversion of Measurement. Mason = Rs 550 per day. Plaster = Rs 300 per day. Carpenter = Rs 500 per day. Bhishti = Rs 350 per day.

    Get Price
  • Rate Analysis of Excavation in Earthwork

    2021-10-27u2002·u2002•Rate analysis of excavation in earthwork use of IS Code 1200 part 1, Part 27, IS 4988, IS 12138 (Part IV) and CPWD for calculation is this measurement of the quantity of excavation to be carried out, the cost of labour, machinery, and other equipment like hard soil for breaker, etc.

    Get Price
  • DPWH Cost Estimate Guidelines.pdf - EQUIPMENT

    EQUIPMENT OUTPUT/DAY BASIC ASSUMPTIONS: 1. Average output of Road Roller (12 passes) 360 m 3 /day (FLAT) (Vibratory Roller) 300 m 3 /day (ROLLING & MOUNTANOUS) 2. Average output of Road Grader 400-500 m 2 /day 3. Average output of Asphalt Distributor 2,400 m 2 /day 4. Average output of Transit Mixer 30 m 3 /day (8 trips – 4 cu. m. cap) 5.

    Get Price
  • How to Calculate Load Carrying Capacity of Conveyor Rollers?

    2020-4-27u2002·u2002Calculating load on conveyor roller is simple arithmetic and very easy. Assume that you have to design a Gravity Roller Conveyor System for carton box conveying. Weight of the carton box is 50kg Length of the box is 400mm Width of the box is 300mm Lets Calculate width of the rollers = width of the carton box + 50mm So Roller length is 350mm Now we have to decide how many rollers …

    Get Price
  • Hand arm vibration - Exposure Calculator

    2021-8-9u2002·u2002Hand-arm vibration exposure calculator. As part of the package which supports the Control of Vibration at Work Regulations 2005 we have produced a calculator to assist in calculating exposures for hand-arm vibration. Before using the calculator please read the guidance leaflet below. Hand-arm vibration at work: A brief guide (INDG175) [1] [1 ...

    Get Price
  • Production Rate Calculator

    2016-4-6u2002·u2002This calculator give you that answer. Use the Volume over Time function with the Unit Volume (uV) equal to 70 gallons, the Duration of Production (dU) equal to one day and the Period of Production (P) equal to 12 weeks. At a constant rate, your herd will produce 5,880 gallons of milk in 12 weeks. Working the other direction.

    Get Price
  • Labour Requirement & Output Per Day For Different Civil Works

    2021-10-26u2002·u2002In a project budget, the toughest thing is to identify the source of material and required manpower calculation. We have to deploy adequate manpower to complete a certain activity without any chaos.. In this post, we had listed out the approx labour requirement for civil works and also Labour output per day for different works.. In the earlier post, we had seen the …

    Get Price
  • MEASURING ROLLER CHAIN LENGTH TECHNICAL SHEET

    2020-7-31u2002·u2002MEASURING ROLLER CHAIN LENGTH INSTRUCTIONS 1. The measurement should contain equal number of roller links and pin links. 2. Measuring longer sections will give more realistic estimations. 3. Chain on equipment should be measured on the tension side. 4. Measurement is outside of pin to outside of pin. 5. Chain not on equipment requires the ...

    Get Price
  • Calculator.net: Free Online Calculators - Math, Fitness ...

    Calculator.net's sole focus is to provide fast, comprehensive, convenient, free online calculators in a plethora of areas. Currently, we have around 200 calculators to help you 'do the math' quickly in areas such as finance, fitness, health, math, and others, and we are still developing more.

    Get Price
  • Department of Public Works and Highways

    2018-7-31u2002·u2002Output per hour: Quantity: DETAILED UNIT PRICE ANALYSIS Construction of By-Pass and Diversion Roads - Vitali - Sibulao - Road of N 1), Package 4, Zamboanga City A.] (3) Construction of Field Office for the Engineer L.S. Bypass Road Project (Alternate I .00 No. E of Persons No. of Ui ment No. No. 7.00 m. x 9.00 T - Cfassoom, for

    Get Price
  • Analysis of Rates of Building Construction in Excel

    2021-7-12u2002·u2002Coarse sand = Rs 800 per cum. Cement 50 kg bag = Rs 270 per bag. Twisted bars = Rs 5000 per Quintel. Bitumen = Rs 10 per kg. See More Units Calculator Excel Sheet for Conversion of Measurement. Mason = Rs 550 per day. Plaster = Rs 300 per day. Carpenter = Rs 500 per day. Bhishti = Rs 350 per day.

    Get Price
  • Rate Analysis of Excavation in Earthwork

    2021-10-27u2002·u2002•Rate analysis of excavation in earthwork use of IS Code 1200 part 1, Part 27, IS 4988, IS 12138 (Part IV) and CPWD for calculation is this measurement of the quantity of excavation to be carried out, the cost of labour, machinery, and other equipment like hard soil for breaker, etc.

    Get Price
  • DPWH Cost Estimate Guidelines.pdf - EQUIPMENT

    EQUIPMENT OUTPUT/DAY BASIC ASSUMPTIONS: 1. Average output of Road Roller (12 passes) 360 m 3 /day (FLAT) (Vibratory Roller) 300 m 3 /day (ROLLING & MOUNTANOUS) 2. Average output of Road Grader 400-500 m 2 /day 3. Average output of Asphalt Distributor 2,400 m 2 /day 4. Average output of Transit Mixer 30 m 3 /day (8 trips – 4 cu. m. cap) 5.

    Get Price
  • How to Calculate Load Carrying Capacity of Conveyor

    2020-4-27u2002·u2002Calculating load on conveyor roller is simple arithmetic and very easy. Assume that you have to design a Gravity Roller Conveyor System for carton box conveying. Weight of the carton box is 50kg Length of the box is 400mm Width of the box is 300mm Lets Calculate width of the rollers = width of the carton box + 50mm So Roller length is 350mm Now we have to decide how many rollers will be below ...

    Get Price
  • Hand arm vibration - Exposure Calculator

    2021-8-9u2002·u2002Hand-arm vibration exposure calculator. As part of the package which supports the Control of Vibration at Work Regulations 2005 we have produced a calculator to assist in calculating exposures for hand-arm vibration. Before using the calculator please read the guidance leaflet below. Hand-arm vibration at work: A brief guide (INDG175) [1] [1 ...

    Get Price
  • Production Rate Calculator

    2016-4-6u2002·u2002This calculator give you that answer. Use the Volume over Time function with the Unit Volume (uV) equal to 70 gallons, the Duration of Production (dU) equal to one day and the Period of Production (P) equal to 12 weeks. At a constant rate, your herd will produce 5,880 gallons of milk in 12 weeks. Working the other direction.

    Get Price
  • Labour Requirement & Output Per Day For Different Civil

    2021-10-26u2002·u2002In a project budget, the toughest thing is to identify the source of material and required manpower calculation. We have to deploy adequate manpower to complete a certain activity without any chaos.. In this post, we had listed out the approx labour requirement for civil works and also Labour output per day for different works.. In the earlier post, we had seen the material calculation for ...

    Get Price
  • MEASURING ROLLER CHAIN LENGTH TECHNICAL SHEET

    2020-7-31u2002·u2002MEASURING ROLLER CHAIN LENGTH INSTRUCTIONS 1. The measurement should contain equal number of roller links and pin links. 2. Measuring longer sections will give more realistic estimations. 3. Chain on equipment should be measured on the tension side. 4. Measurement is outside of pin to outside of pin. 5. Chain not on equipment requires the ...

    Get Price
  • Calculator.net: Free Online Calculators - Math, Fitness ...

    Calculator.net's sole focus is to provide fast, comprehensive, convenient, free online calculators in a plethora of areas. Currently, we have around 200 calculators to help you 'do the math' quickly in areas such as finance, fitness, health, math, and others, and we are still developing more.

    Get Price
  • Department of Public Works and Highways

    2018-7-31u2002·u2002Output per hour: Quantity: DETAILED UNIT PRICE ANALYSIS Construction of By-Pass and Diversion Roads - Vitali - Sibulao - Road of N 1), Package 4, Zamboanga City A.] (3) Construction of Field Office for the Engineer L.S. Bypass Road Project (Alternate I .00 No. E of Persons No. of Ui ment No. No. 7.00 m. x 9.00 T - Cfassoom, for

    Get Price
  • Analysis of Rates of Building Construction in Excel

    2021-7-12u2002·u2002Coarse sand = Rs 800 per cum. Cement 50 kg bag = Rs 270 per bag. Twisted bars = Rs 5000 per Quintel. Bitumen = Rs 10 per kg. See More Units Calculator Excel Sheet for Conversion of Measurement. Mason = Rs 550 per day. Plaster = Rs 300 per day. Carpenter = Rs 500 per day. Bhishti = Rs 350 per day.

    Get Price
  • Rate Analysis of Excavation in Earthwork

    2021-10-27u2002·u2002•Rate analysis of excavation in earthwork use of IS Code 1200 part 1, Part 27, IS 4988, IS 12138 (Part IV) and CPWD for calculation is this measurement of the quantity of excavation to be carried out, the cost of labour, machinery, and other equipment like hard soil for breaker, etc.

    Get Price